電子拉力試驗(yàn)機(jī)故障
電子材料試驗(yàn)機(jī)主機(jī)電源有電,但設(shè)備不能上下移動(dòng)。
排除方法:
檢查是否是15S以后設(shè)備還無法移動(dòng),因?yàn)橹鳈C(jī)開機(jī)需要自檢,大概需要15S時(shí)間;檢查上下限位是否再恰當(dāng)?shù)奈恢?,有一定的運(yùn)行空間;檢查接入試驗(yàn)機(jī)的電源電壓是否正常?;蛟S還會有其他問題,這個(gè)需要我們在日常的生活中不斷地摸索解決的。
2、試驗(yàn)機(jī)主機(jī)電源不亮,且設(shè)備不能上下移動(dòng)。
排除方法:
檢查接入試驗(yàn)機(jī)的電源線路是否連接正常;檢查急停開關(guān)是否處于擰起狀態(tài);檢查接入拉力試驗(yàn)機(jī)的電源電壓是否正常;檢查機(jī)器插座上的保險(xiǎn)是否燒斷,請取出備用保險(xiǎn)絲安裝即可。
3、試驗(yàn)機(jī)主機(jī)電源不亮,且不能上下移動(dòng)。解決拉力機(jī)方案是檢查接入試驗(yàn)機(jī)的電源線路是否連接正常;檢查急停開關(guān)是否處于擰起狀態(tài);檢查接入試驗(yàn)機(jī)的電源電壓是否正常;檢查機(jī)器插座上的保險(xiǎn)是否燒斷,請取出備用保險(xiǎn)絲安裝即可。
4、解決拉力機(jī)方案是檢查計(jì)算機(jī)與試驗(yàn)機(jī)的通訊線是否脫落;檢查聯(lián)機(jī)選擇傳感器是否選擇正確;檢查拉力機(jī)zui近的試驗(yàn)或操作鍵盤時(shí)拉力機(jī)傳感器是否被撞過; 電腦試驗(yàn)機(jī)檢查出現(xiàn)問題之前是否使用了軟件的校準(zhǔn)或標(biāo)定功能;檢查電腦拉力試驗(yàn)機(jī)是否手動(dòng)更改過校準(zhǔn)值、拉力機(jī)標(biāo)定值或硬件參數(shù)中的其他信息
Electronic universal testing machine, the main power supply, but the equipment can not move up and down.
Removal method:
Check whether the 15S device is also unable to move, because the host need to boot self-test, about 15S time; check whether the upper and lower limit to the appropriate location to run a certain space; the power supply voltage is normal check access testing machine. There may be other problems, which need to be explored and solved in our daily life.
2, universal test machine host power supply is not bright, and equipment can not move up and down.
Removal method:
Power line inspection access testing machine is connected properly; check the emergency stop switch is in screwed state; the power supply voltage check access universal tensile testing machine is normal; check the machine on the socket insurance is burned off, remove the spare fuse can be installed.
3, universal test machine host power supply is not bright, and can not move up and down. To solve the tension scheme is power line access testing machine is connected properly; check the emergency stop switch is in screwed state; the power supply voltage check access test machine is normal; check the machine on the socket insurance is burned off, remove the spare fuse can be installed.
4, to solve the universal tensile machine is a communication line and check the computer testing machine is off; check whether to choose the correct choice of sensor on-line inspection; tensile machine recent test or keyboard when tension sensor is knocked over; check the computer is using a universal testing machine appears software calibration or calibration function before check; computer testing machine to manually change the calibration value, tensile machine calibration value or other information in the hardware parameters
- 材料試驗(yàn)機(jī)universal material testing machine; universal testing machine
- 上下移動(dòng)reciprocate
- 無法移動(dòng)irremovability
- 上下限bound
- 試驗(yàn)機(jī)tester; testing machine
- 電源電壓supply voltage
- 不斷地constantly; continuously; continually; ceaselessly; endlessly
- 試驗(yàn)機(jī)universal test(ing) machine
- 電源線路power circuit
- 拉力試驗(yàn)機(jī)universal tensile testing machine
主營儀器:電壓擊穿試驗(yàn)儀,介電擊穿強(qiáng)度試驗(yàn)儀 ,耐電壓強(qiáng)度擊穿試驗(yàn)儀,電子拉力試驗(yàn)機(jī),TOC分析儀